Case Studies

Main Contractor: Booker and Best Ltd, New Residential Property, Herbrand Walk Little Common

This is a new substantial new build property which is immediately adjacent to the beach. it was designed to take advantage of the amazing location....

Client: Bourne Leisure, Allhallows Holiday Park, Allhallows Kent

King Brothers were contracted by Bourne Leisure to construct 22 bases for static caravans. These works were carried out including soft and hard landscaping, drainage and services....

Client: Bourne Leisure, Pagham near Chichester

Construction of static park home bases together with roads, hard and soft landscaping together with services. This is a particularly poor draining site, the road was constructed to allow drainage to occur....

Main Contractor: Bishop and Levett Ltd, New Build Development of 12 Houses in Sutton Mews Seaford

This site was a new build development of 12 houses, foundation up to DPC level including drainage. Soft and hard landscaping were all carried out and completed in 2017....

Main Contractor: Bishop & Levett Construction of Large Extension Ashton Grange Horsham

All ground works carried out to this site including drainage, soft and hard landscaping up to DPC level, foundations up to beam and block.

Main contractor BCP (Building Construction Partnership) 59 bedroom nursing home, East Dean Road Eastbourne....

Client: DM&C Ash Developments, 2 Large New Build Private Residence With Basement.

Excavation works together with forming a basement structure on a sloping site, together with formwork ground works including drainage services, soft and hard landscaping....

Client: Bourne Leisure, Combe Haven Holiday Park St Leonards on Sea

The lower part of this site suffered from flooding on a number of occasions. A scheme was to be designed to install driven sheet piling to form a bund. These works have been completed for four years and have been very successful as no further flooding...

Main Contractor: Bishop & Levett Staple Cross Cattery and Private Residence

The ground conditions on this site were poor and piling was required together with a ring beam foundation....