Case study:

Client: Bourne Leisure, Combe Haven Holiday Park St Leonards on Sea

The lower part of this site suffered from flooding on a number of occasions. A scheme was to be designed to install driven sheet piling to form a bund. These works have been completed for four years and have been very successful as no further flooding has occurred in that time.